… state-led firm Metals and Engineering Corporation (METEC), which was responsible for installing turbines for the Grand Ethiopian Renaissance Dam (GERD).
Source: Brookings Institution (blog)
8/31/2018
… state-led firm Metals and Engineering Corporation (METEC), which was responsible for installing turbines for the Grand Ethiopian Renaissance Dam (GERD).
Source: Brookings Institution (blog)
8/31/2018